Put your ad code here

header ads
header ads

What Is Bar Bending Schedule?

                      What Is Ber Bending Schedule?

What is Bar Bending Schedule:- 

Bar Bending schedule is commonly referred to as BBS Bar bendingschedule (or schedule of bars) is a list of reinforcement bars, and given rcc work item, and is presented in a tabular form for easy visual reference .We also calculate all materials and making a tables. This tables have all the needed particulars of bars-like no of item, bars. Diameter of bars, no each type of bar, etc. And this table is provide total quantity of bar and this information is a great help in preparing an estimate of quantities.

 

How to prepare a BBS?

Necessary Columns
·         Bar number/Bar Mark Reference
·         Bar shape
·         Diameter
·         Spacing
·         Length of bar
·         Cutting Length
·         Number of bars

NOTE :
Extra bar for L hook= 6ø
For Round hook=9ø
For cranked bar(45®)=0.42d(d=depth of section)
Cranked(30®)=0.27d

Formula:

§  Total length of vertical bar = floor height (1,2,3) + height of ground level + Ld + overlap length.
 

 
bar bending schedule
BAR BENDING SCHEDULE


Post a Comment

0 Comments